FW_2611-12_FINAL - Flipbook - Page 46
SAFETY CORNER
INDUSTRY INSIGHTS
by Mike Denninger, North America Regional Advisory Board Chair Director, 2027-2029
Safely Speaking at IAAPA Expo
Including safety in negotiations at IAAPA Expo 2026
IAAPA NEWS
THE IAAPA EXPO TRADE SHOW FLOOR
is full of energy and possibilities. Having
suppliers, service providers, and project
participants in one location makes IAAPA
Expo an efficient place to work through
questions and safety protocols.
Before stepping foot in the South
Building or West Building at the Orange
County Convention Center, Funworld
asked experienced ride developer Mike
Denninger for his top 5 suggestions on
how to get the most from conversations
with exhibitors.
1
Have a Plan
Where practical, align your project activities and decisions with the opportunity
to meet at Expo. Know what you want
to accomplish, and which discussions
are most important. Do that by scheduling each day ahead of time. Arrange key
meetings in advance, and make time for
education sessions, facility tours, and conversations with industry colleagues.
Use the IAAPA Connect+ app to help
plan your time and locate exhibitors.
One scheduling tip: Thursday and Friday
can offer opportunities for additional,
unplanned conversations, although it is
always best to confirm availability with
each exhibitor.
2
Plan for the Longterm
Investment
In addition to the initial purchase price
and guest experience, understand staffing,
maintenance, inspection, training, and
long-term support requirements. Involving
operations, maintenance, and safety teams
early helps operators ask better questions
and make more informed decisions.
3
Include Standards
and Compliance in the
Conversations
Identify the specific standards and/or
codes that will apply to new equipment
44
purchases, such as relevant ASTM or EN standards, along with
requirements of the jurisdiction where the new ride will be
installed. Agree on the documentation, testing, and verification
that will demonstrate the equipment meets those requirements.
4
Discuss Responsibilities
Develop a responsibility matrix that identifies major ownership
items from design through opening. Operators should document
what the supplier, owner, and other project participants will
provide. This should cover design, site interfaces, installation,
inspections, testing, commissioning, training, and preparation
for opening. Safety and security provisions—such as restricted
access, fencing, and emergency access—should have clearly
assigned responsibilities. Define operational and acceptance
criteria and the information needed before the equipment is
placed into service. A formal risk assessment—developed with
input from the appropriate parties and reviewed as the project
evolves—can help identify these needs and clarify how they will
be addressed.
5
Establish Expectations
Before a new ride opens, establish operating and maintenance
documentation, training, technical support, replacement parts,
and communication of safety bulletins or required updates.
Operators need to discuss foreseeable emergency conditions,
evacuation needs, and any specialized equipment or training that
will be required. For equipment connected via Wi-Fi or a dedicated data line, address how remote access will be authorized and
controlled, along with who is responsible for software updates.
Finally, leave time to discover something fresh. A new product, a different approach, or an unexpected conversation can lead
to an idea that benefits an operator’s business.
Funworld | NOVEMBER/DECEMBER 2026 | IAAPA.org/Funworld
Mike Denninger,
P.E., is the founder
of Denninger
Development LLC,
an attractions
consultancy, and a
veteran attractions
executive with more
than 36 years of
experience in ride
engineering, capital
development, and
operational safety.
Mike currently serves
as chair of IAAPA’s
North American
Safety & Security
Committee and is a
member of IAAPA’s
Global Safety &
Security Committee
and North American
Regional Advisory
Board. Connect with
:
him on